LOCATION: Loreto, Peru
Acero was responsible for providing technical direction to the EPC contractor for a 20,000 BPD EPF, which included project management consulting and the review of all major deliverables. Additionally, the scope involved completing PFDs and P&IDs for a 2,500 BPD EPF.
Well production for 18.6° API oil occurred naturally before transitioning to a jet pump artificial lift system sized for a capacity of 4,000 BPD of total fluids. Produced fluids driven by the jet pump were directed to a two-phase separator to remove associated gas, which was subsequently sent to a flare. Production water was designed to be stored in tanks, while the final product was either transported on barges or injected into a sump pit.