PROJECT: Pipeline Integrity – Repairs, Sectional Replacements, and Rerouting
COMPANY: Confidential Client
LOCATION: Various

Scope of work included the engineering and assessment of several temporary & permanent B-sleeve repairs between 6” – 22” designed to fit directly on pipe or with an elevated collar (dependent on severity of wrinkle). Typical deliverables have included, repair drawings, Finite Element Analysis, fatigue analysis, and final report.

Acero provided several design packages for partial pipeline replacements including rail, road and water body crossings. Typical scope has included stress analysis, pipeline & riser details, bend specification & schedule and alignment sheets.

Scope of work included the engineering and assessment of several FRP pipeline failures, temporary & permanent repairs. Typical deliverables have included, repair drawings, stress analysis, fatigue analysis, and final report.

Acero was also responsible for investigating other equipment and piping corrosion issues including (but not limited to ) corrosion under insulation (CUI). CUI is one of the (petro) chemical processing industry’s worst problems; the cost associated to mitigating it is astronomical.
PROJECT: Asset Circuitization Support
COMPANY: Confidential Client
LOCATION: Various

Acero’s scope of work was to prepare the circuitization package for 70 sites (including several pump stations LACTs, and Gas processing facilities) and identify the circuitization loops and asset verification to ensure integrity and safety.