Domestic Project Highlights

International Project Highlights
Project Experience
- Gas Processing Facilities
- Compressor Stations
- Pump Stations
- Conventional Oil Facilities
- Water Injection Facilities | Download our Water Handling Brochure Here
- Oil Storage Facilities
- Pipeline Projects | Download our Pipeline Highlights Brochure Here
- Piping Integrity Support
- Power Generation
- Specifications
- Domestic Project Highlights | Download our Domestic Highlights Brochure Here
- International Project Highlight | Download our International Project Highlights Brochure Here
DOMESTIC PROJECT HIGHLIGHTS
Gas Processing Facilities
Gas Processing Facilities – Domestic
PROJECT: Septimus Sour Gas Plant Phase 1 – 20 MMSCFD, & Expansion to 40 MMSCFD
COMPANY: Crew Energy Inc.
LOCATION: Fort St. John, BC
Acero was responsible for the engineering, procurement and construction management of a 20 MMSCFD sour gas inlet refrigeration and LPG extraction plant, and expansion to handle 40 MMSCFD. Scope of work included up front scoping support, including assessment of best location for plant placement, FEED and detailed design. Detailed deliverables included (but was not limited to) costing and controls, planning (scheduling), 3D model and associated outputs, E&I drawings, and I&C control schematics.costing and controls, planning (scheduling), logistics.
PROJECT: Gas Plant Debottleneck and Expansion FEED and Detailed Engineering
COMPANY: Painted Pony Energy Ltd.
LOCATION: Fort St. John, BC
Acero’s scope of work included compressor installation to expand compression from 28 MMSCFD to 40 MMSCFD, flare system upgrade without taking the existing system offline, power generation expansion, coalescing filter installation, fuel gas measurement system, and regulatory support.
PROJECT: B-24-H Sour Gas Plant Debottleneck and Expansion FEED and Detailed Engineering
COMPANY: Confidential Client
LOCATION: Fort St. John, BC
Acero’s scope of work was to add an additional 40 MMSCFD train in parallel with an existing 20 MMSCFD raw gas facility. Facility improvements included slug catcher, relocation and use of an available separator as FKOD for acid gas going to incinerator, evaluation and upgrade of gas power/ generator units to accommodate winter consumption (mainly heat tracing); associated instrumentation and control upgrades and accommodations.
PROJECT: Progress Venturi VRU
COMPANY: Confidential Client
LOCATION: Pouce, AB
Acero was responsible for the engineering, design, procurement and schedule of flare and VRU system revamp. Acero had already completed a capacity study to help plan for potential upgrades including the evaluation of all primary process equipment. Engineering assessments were completed for an estimate of fuel gas consumption, instrument air consumption, flare gas usage and as well, some blockage issues (resulting in thief hatch releases at the tank farm). Purge gas and venturi system designs were merged to minimize wasted gas (by conserving during tank out-breathing) and resolve thief hatch issues by providing positive gas during in-breathing.
PROJECT: McMahon Gas Plant Amine Still Replacement
COMPANY: Confidential Client
LOCATION: NE BC
Acero’s scope of work included the FEED, detailed engineering, and procurement for the replacement of an Amine Still (column #3) with an in-kind replacement, but constructed of 316 L stainless steel materials, at the McMahon Gas Plant.
Gas Processing Facilities – International
PROJECT: Badila Gas Injection
COMPANY: PCM, a Glencore Company
LOCATION: Chad, Africa
Acero was responsible for the detailed engineering and design, project controls, and technical support for all procurement activities for a gas injection facility capable of injecting 12 MMSCFD of gas at 1,500 psig.
PROJECT: Kurdamir Block Development
COMPANY: Confidential Client
LOCATION: Kurdistan, Iraq
Acero was responsible for a conceptual study for the development of the Kurdamir Block (Greenfield) in Kurdistan, Iraq. Scope of work included the conceptual study for 50,000 BOPD CPF and 300 MMSCFD gas plant c/w sulphur recovery, project scheduling and TIC estimate.
PROJECT: Amguri Interim Condensate Recovery
COMPANY: Canoro Resources Ltd.
LOCATION: Assam, India
Acero was responsible for the detailed engineering and design, procurement and logistics, and construction management of a brownfield, 20 MMSCFD gas inlet / 1,500 bpd condensate recovery project in remote, northeast India. With the reservoir in “retrograde condensation” (ie. liquids being permanently lost in the reservoir due to depressurisation causing an in-situ gas to liquid phase change), the project was fast-tracked and interim condensate removal was installed.

Compressor Stations
PROJECT: Wilrich 16-27 Compressor Station Expansion FEED and Detailed Engineering
COMPANY: Confidential Client
LOCATION: Central AB
Acero was responsible for expanding the Wilrich compressor station with a historic throughput of 22 MMSCFD of raw gas and condensate. The expansion was with a 48 MMSCFD train, parallel to the existing 22 MMSCFD facility; resulting in a total plant throughput capacity of 70 MMSCFD. Other facility upgrades included 3 phase inlet separators, dehydrator, new MCC building, upgrade of existing incinerator burner, one new high pressure flare stack, one new flare knockout drum were also incorporated.
PROJECT: Daiber Compressor Station
COMPANY: Painted Pony Energy Inc.
LOCATION: Fort St. John, BC
Acero’s scope of work included the engineering, design and regulatory support of a new compressor/dehydration facility designed for 50 MMSCFD of high pressure production and 25 MMSCFD of lower pressure compression. Water storage, power generation and sales gas metering was also required.
PROJECT: Gas Plant Debottleneck and Expansion
COMPANY: Painted Pony Energy Inc.
LOCATION: Fort St. John, BC
Acero was responsible for the FEED, detailed engineering and regulatory support of a compression expansion from 28 MMSCFD to 40 MMSCFD. Other facility upgrades included flare system upgrade, power generation including generator installation, and fuel gas measurement.
PROJECT: Pine Creek Compressor Station FEED
COMPANY: Confidential Client
LOCATION: Edson, AB
Acero’s scope of work included the engineering, procurement, and construction support of a green-field compressor station designed for 10 MMSCFD throughput of sour gas.
PROJECT: Pine Creek Compressor Station FEED
COMPANY: Confidential Client
LOCATION: Edson, AB
Acero was responsible for the engineering, design and procurement of a compressor station in order to process the production of new sour wells. Plant capacity designed to handle 20-25 MMSCFD of gas with a maximum liquid yield of 100 bbl/MMSCF.

Pump Stations
Pump Stations – Domestic
PROJECT: Booster Pump Installation
COMPANY: Pengrowth Energy Corp.
LOCATION: Judy Creek, AB
Acero was responsible for the detailed engineering and design, procurement of main equipment and construction support of a pump station in central Alberta. The project featured two 750 HP pumps and housings to provide water injection capacity of 16,000 m3/d at 14,900 kPag.
PROJECT: Asset Circuitization Support
COMPANY: Confidential Client
LOCATION: Various
Acero’s scope of work was to inspect 70 sites (including several pump stations) and identify the circuitization loops and asset verification to assure integrity and safety. Each site examined required tailoring of the inspection scrutiny based on operating conditions.
Pump Stations – International
PROJECT: Crude Oil Topping Unit
COMPANY: Griffiths, a Glencore Company
LOCATION: Chad, Africa
Acero was responsible for the conceptual study to evaluate the feasibility of installing crude oil topping at the initial pumping station of a 16” 520 km pipeline. Pipeline hydraulic simulations were also provided to analyze options for pump and heating stations, variations in MAOP, production capacities, pipeline sizes, based on crude oil assay and temperature.

Conventional Oil Facilities
Conventional Oil Facilites – Domestic
PROJECT: Gilby Central Oil Battery (FEED & Detailed Engineering)
COMPANY: Confidential Client
LOCATION: Central AB
Project featured the detailed engineering and design of a new central oil battery to handle 4,000 BBL/D of light oil, and 5 MMSCFD of gas.
PROJECT: Gilby Oil Battery Debottlenecking Pre-FEED
COMPANY: Confidential Client
LOCATION: Central AB
Acero was responsible for determining the feasibility of developing a central multi-well processing oil battery for two production capacity options (25,000 bbl/d & 4,000 bbl/d) at a new Gilby pilot production facility versus debottleneck of an existing facility.
PROJECT: Alderson Oil Batteries
COMPANY: Crew Energy Inc.
LOCATION: Southern AB
Acero was responsible for the design and regulatory support, procurement and construction of several oil batteries and expansions in the Alderson Field.
PROJECT: Garrington Glycol Dehy Installation
COMPANY: Pengrowth Energy Corp.
LOCATION: Southern AB
Acero was responsible for the process sizing, selection, and integration of a Glycol Dehy into an existing facility to allow for increased production through the battery, and onward, to a new third party producer. El&C was also required to upgrade the existing MCC, and as well, to perform a technical review of vendor design and documentation.
PROJECT: Carson Creek Tank Installation
COMPANY: Pengrowth Energy Corp.
LOCATION: Carson Creek, AB
Project featured the detailed tank and foundation design and process review, procurement support of a 15,000 bbl produced water storage tank, and 10” flare installation to accommodate increased volume from the field.
Conventional Oil Facilities – International
PROJECT: Acordionero CPF Expansion
COMPANY: Gran Tierra Energy Inc.
LOCATION: Middle Magdalena Basin, Colombia
Since 2017, Acero has been responsible for several projects; Pre-FEED through detailed design, related to the expansion of an existing early production facility (EPF) into a central processing facility (CPF) in the Acordionero field in Colombia. The facility was expanded to handle larger volumes of produced liquids, from 3,500 BOPD to 7,500 BOPD.
- CPF expansion phase 1 – from 3,500 BOPD to 7,500 BOPD (Pre-FEED through detailed design including procurement support)
- CPF expansion phase 2 – 15,000 BOPD (FEED, procurement & detailed design support)
- CPF expansion phase 3 – 25,000 BOPD (Debottlenecking study)
PROJECT: 40,000 BOPD Operation & Maintenance Support Facility
COMPANY: Confidential Client
LOCATION: Al-Basrah, Iraq
Acero was responsible for the front end conceptual engineering through to detailed design of a 40,000 bopd operation and maintenance support facility in the Zubair oilfield of southern Iraq. Scope of work also included procurement, and coordination of inspection and logistics of major equipment.
PROJECT: Bretana Development
COMPANY: Gran Tierra Energy Inc.
LOCATION: Loreto, Peru
Acero was responsible for providing technical direction to the EPC contractor for a 20,000 bpd EPF, completing PFDs and P&IDs for a 2,500 bpd EPF, project management consulting and reviewing all major deliverables.
Well production for 18.6 degree API oil produced naturally, then moved to jet pump artificial lift system sized for a capacity of 4,000 BPD of total fluids. Produced fluids driven by the jet pump were directed to a two phase separator in order to remove associated gas which was sent to a flare, while production water was designed to be stored in tanks. Production was either transported on barges or injected into a sump pit

WATER HANDLING BROCHURE
Water Injection Facilities
Water Injection – Domestic
PROJECT: Water Injection Facility & Pipeline
COMPANY: Pengrowth Energy Corp.
LOCATION: Judy Creek, AB
Acero was responsible for the detailed engineering, design, procurement, regulatory support and construction management of a water injection facility and pipeline in Judy Creek, Alberta. The project featured the installation of two salt water injection pipelines, facility piping, including pipeline tie-ins (as well as design considerations for future tie-ins), horizontal filter selection, pump design, line pipe design and selection.
PROJECT: Water Disposal Facility
COMPANY: Confidential Client
LOCATION: Peace River, AB
Acero was responsible for the detailed engineering, design, procurement and construction management of the expansion of an existing oil battery to incorporate water handling and disposal capability at the site. The project featured new (fiberspar) pipelines to gather water from other batteries, and to deliver produced water to nearby disposal wells. Facility work included the design and installation of three 2000 bbl water tanks, and various water transfer/skim oil/disposal pumps.
PROJECT: Parkland Water Injection
COMPANY: Confidential Client
LOCATION: Fort St. John, BC
Acero was responsible for the detailed design and procurement for a water disposal facility at the Parkland Gas Plant, capable of handling 300 m3/d, with the ability to expand to 600 m3/d in the future. A new injection pump skid, condensate tank and pipeline will be installed as part of the project.
Water Injection – International
PROJECT: Acordionero Water Injection Facility
COMPANY: Gran Tierra Energy Inc.
LOCATION: San Martin, Colombia
Acero was responsible for providing a conceptual design for the expansion of the Acordionero central processing facility (CPF) to include produced water treatment and injection equipment. The new water handling facility was designed for a throughput capacity of 39,000 BWPD complete with necessary high pressure pipeline to inject through six (6) nearby injection wells each with two zones.
PROJECT: Badila CPF Water Injection Project
COMPANY: PCM, a Glencore Company
LOCATION: Chad, Africa
Acero was responsible for Pre-FEED and FEED for a water treatment and injection facility over two phases (35,000 BWPD & 65,000 BWPD) by installing CPI, skimming tanks, booster pumps, filters and high pressure injection facility complete with a high pressure water injection network. Scope of work also included an 8 MW gas to power generation facility, required to service the facilities increased power demand.
CLICK HERE TO DOWNLOAD our Water Handling Highlights Brochure

Oil Storage Facilities
Oil Storage Facilities – Domestic
PROJECT: Tank Replacements
COMPANY: Pengrowth Energy Corp.
LOCATION: Judy Creek, AB
Project featured the replacement of an existing 10,000 BBL shipping tank with 3,000 BBL tank, replacement of 3,000 BBL water tank with 2,000 BBL tank, on-site jack-n-roll relocation and refurbishment of 10,000 BBL produced water storage tank (including foundation design and roof replacement), and construction planning and schedule control.
PROJECT: Carson Creek Tank Installations
COMPANY: Pengrowth Energy Corp.
LOCATION: Carson Creek, AB
Project featured the detailed tank and foundation design and process review, procurement support of a 15,000 bbl produced water storage tank, and 10” flare installation to accommodate increased volume from tank.
Oil Storage Facilities – International
PROJECT: Acordionero Crude Oil Export P/L and Blending Terminal
COMPANY: Gran Teirra Energy Inc.
LOCATION: San Martin, Colombia
Acero was responsible for assessing two options to export crude oil from Acordionero Central Processing Facility (CPF). Option one included a blending terminal near the CPF with a short pipeline to handle 15,000 bpd of crude oil. The second option was to construct a new pipline 11km from the CPF to a new truck out facility.

PIPELINE HIGHLIGHTS
Pipeline Projects
Pipeline Projects – Domestic
PROJECT: Pipeline Project
COMPANY: Polar Star Oil and Gas Inc.
LOCATION: Laprise Creek, BC
Acero’s scope of work included the engineering and design, procurement, and regulatory support for a 10”, 12 km main trunk line with 4” parallel common ditch fuel gas pipeline, as part of a new gathering system. Crossing considerations included 7 open-cut road allowances, 18 stream crossings (3 of which were bored), and 4 archaeological no-work zones, which were bored.
PROJECT: Gas Pipeline Replacements
COMPANY: Pengrowth Energy Corp.
LOCATION: Swan Hills, AB
Acero’s scope of work included the detailed design and procurement of multiple 4” to 12” LP & HP gas pipeline replacements (externally coated steel as well as free standing liner composite pipelines). Projects featured a new pipeline separator (96” OD x 20’ S/S), surface piping, instrumentation and controls, pig launching and receiving facilities, major road and water crossings.
PROJECT: Pipeline Network Modeling
COMPANY: Pengrowth Energy Corp.
LOCATION: Irricana, AB
Project featured a Pipe-Flo model for the existing wells and pipelines in the Irricana area to evaluate the existing network, simulate options for the re-routing of production, and to bring low producing shut-in wells back online. Network contained 20 wells, 42 pipeline segments, and 1 booster compressor.
Pipeline Projects – International
PROJECT: Doseo Pipeline project FEED
COMPANY: Confidential Client
LOCATION: Chad, Africa
Scope of work consisted of cost estimating to support alternative configurations and options, development of temperature gradient monitoring, feasibility assessment of on-shore barge equipment, and development of estimating TIC template.
CLICK HERE TO DOWNLOAD our Pipeline Highlights Brochure

Pipeline Integrity Support
Pipeline Integrity Support Projects – International
PROJECT: Pipeline Integrity – Repairs, Sectional Replacements, and Rerouting
COMPANY: Confidential Client
LOCATION: Various
- Scope of work included the engineering and assessment of several temporary & permanent sleeve repairs between 8” – 22” designed to fit directly on pipe or with an elevated collar (dependent on severity of wrinkle). Typical deliverables have included, repair drawings, Finite Element Analysis, fatigue analysis, and final report.
- Acero provided several design packages for partial pipeline replacements including rail, road and water body crossings. Typical scope has included stress analysis, pipeline & riser details, bend specification & schedule and alignment sheets.

Power Generation
Power Generation – Domestic
PROJECT: Power Generation
COMPANY: Confidential Client
LOCATION: Central AB
Acero provided full engineering services for the scoping, design, procurement and installation of (currently) 16 MW of power (at five locations) so as to significantly reduce reliance on utility power costs while at the same time, taking advantage of available (cheap) fuel gas.
PROJECT: Power Generation
COMPANY: Confidential Client
LOCATION: Swan Hills, AB
Acero was responsible for evaluating two power generation scenarios for power generation with the option to sell excess power to the grid in the future. Scope of work included feasibility and design, regulatory support, and construction and commissioning support.
Power Generation – International
PROJECT: Mangara Power Generation and Generation to Well Site FEED
COMPANY: PCM, a Glencore Company
LOCATION: Chad, Africa
Acero was responsible for completing a FEED study for the power generation (6 MW), sub-station and transmission line requirements to supply power to a minimum of 20 well sites with provision to expand to 50 well sites. Scope of work included a technology optimization study, technical safety review and bid evaluations and recommendations.
PROJECT: Acordionero Power Generation and Distribution Pre-FEED
COMPANY: Gran Tierra Energy Inc.
LOCATION: San Martin, Colombia
Acero was responsible for a pre-FEED study to build a 15 MW central power generating facility located at the Acordionero CPF. The intent of the generation facility was to supply power to the CPF, water injection facility, truck loading and six (6) well pads via a transmission network.

Specifications
PROJECT: Specification Development for E&P Facilities & Pipelines
COMPANY: Various
Acero has developed & implemented in-house mechanical specifications for Domestic and International energy companies.
A sample of some of the specifications that Acero has written include:
EQUIPMENT SPECIFICATIONS
• API 610 centrifugal pumps
• ASME B73.1 general sour horizontal centrifugal pumps
• Positive displacement/reciprocating pumps
• Direct and indirect fired heaters
• Heat medium package
• Pressure vessels and heat exchangers
• Above ground knock out drums
EI&C RELATED SPECIFICATIONS
• Emergency shutdown valves
• Instrumentation for skid-packaged equipment
• Design specifications: process design of flare and blowdown systems, pressure control and OPP guidelines, isolation standard
FACILITY PIPING SPECIFICATIONS
• Piping tables for B31.3, CSA B149.1, CSA Z662
• Services: sweet, sour, cryogenic, corrosive, fuel gas distribution system, liquid sulphur, utility, heating fluids, lubricants/hydraulic fluids
• Materials: carbon steel, stainless steel
• Manual valves
• Stainless steel tubing
OTHER SPECIFICATIONS AND STANDARDS
• Pressure welding (piping & equipment)
• Pig closure replacement procedure
• Bolting, gaskets and torquing
• Induction bends from steel pipe

Domestic Project Highlights
Domestic Project Highlights
Acero has a diverse project portfolio which includes tight budget and schedule field-operations-driven MOC projects, numerous green/brown field facility projects ranging in size/complexity, CPFs, stand-alone gas plant projects and numerous pipeline projects. Acero has completed over 2,500 well tie-ins and associated gathering systems, oil and gas facility upgrades and can easily facilitate projects up to $100MM TIC.
MAJOR PROJECTS | ||||
Client | Location | Year | Project | Description |
Baytex Energy Corp. | Various | 2008 – Ongoing | Field Development Programs | Participated in over 300 projects ranging in size and complexity throughout Peace River, Lloydminster, Duverney. |
Painted Pony Energy Ltd. | Fort St. John, BC | 2013 – Ongoing | Field Development Projects | Well Pad Equipment Projects, Gas Plant Debottleneck & Expansion |
Confidential Client | Judy Creek, AB | 2018 – Ongoing | Pipeline Replacements | 3″ & 4″ FRP HP Produced Water Injection Pipelines, 3″ & 4″ FRP Flowline Replacements, 8″ FRM Groupline Replacements |
Confidential Client | Kaybob/South Swann Hills/Virginia Hills | 2018 – Ongoing | Engineering General Support | Engineering Support for Carson Creek Gas Plant, Judy Creek Gas Plant |
Canadian Natural Resources Ltd (CNRL) | Septimis, Ferrier | 2017 – Ongoing | Multi-Well Pad & Pipeline Projects | Multi-Well Pad & Pipeline installations including acid gas pipeline from Stoddart gas plant |
Various | Various | 2017 – Ongoing | Specification Development for E&P Facilities & Pipelines | In-house mechanical specs for Domestic & International energy companies |
Confidential Client | Various | 2019 | Methane Emissions | Site visit to validate whether or not they need a methane reduction retrofit compliance plan (MRRCP) |
Confidential Client | Fort St. John, BC | 2019 | Parkland Water Injection | Designed to handle 300m3/d with ability to expand to 600 m3/d |
Painted Pony Energy Ltd. | Fort St. John, BC | 2019 | Daiber Compressor Station | Designed for 50 MMSCFD of high press production and 25 MMSCFD of low pressure compression |
Razor Energy Corp. | Swan Hills, AB | 2019 | Power Generation | Evaluation of (2) power generation scenarios |
Confidential Client | Red Deer, AB | 2018 – 2019 | Gilby Central Oil Battery | 4,0000 BBL/D Light oil, and 5 MMSCFD gas |
Confidential Client | Grande Prairie, AB | 2018 | Amine Installations | Amine plants will have a gas max throughput of 60 MMSCFD, and amine circulation rate of 60 GPM (each) |
Confidential Client | Fort St. John, BC | 2018 | McMahon Gas Plant Amine Still Replacement | Amine Still replacement with 316L stainless steel |
Confidential Client | Central AB | 2018 | Ferrier Gas Plant & Debottlenecking | Pre-FEED to increase throughput from 6 to 13 MMSCFD and 1,200 to 2,000 bpd of condensate |
Confidential Client | Edson, AB | 2018 | Pine Creek Compressor Station FEED | Designed to handle 20-25 MMSCFD of gas with maximum liquid yield of 100bbl/MMSCFD |
Baytex Energy Corp. | Soda Lake, SK | 2018 | Soda Lake Water flood Expansion | Pipeline and facility engineering to expand water flood operation, with consideration to become polymer flood in future operations. |
Confidential Client | Various | 2018 | Asset Circutization Support | Circutization and asset verification of 70 sites |
Confidential Client | Central AB | 2017-2018 | Power Generation | 16 MW power at give locations to reduce reliance on utility power |
Confidential Client | Fort St. John, BC | 2017-2018 | B-24-H Sour Gas Plant Debottleneck Expansion | Expansion from 22 MMSCFD to 40 MMSCFD |
Pengrowth Energy Corp | Montney Field, BC | 2017 | Pipeline Network Modeling | Network contained (17) wells, (7) pipeline segments |
Pengrowth Energy Corp | Irricana, AB | 2017 | Pipeline Network Modeling | Network contained (20) wells, (42) pipeline segments, and (1) booster compressor |
Confidential Client | Laprise Creek, BC | 2017 | Water Hub Pipelines | (5) Bi-directional pipelines from CPF to water storage facility |
Confidential Client | Central AB | 2017 | Wilrich Compressor Station Expansion | Addition of 48 MMSCFD train in parallel with existing 22 MMSCFD facility; resulting in total plant throughput of 60 MMSCFD |
Confidential Client | Edson, AB | 2017 | Edson Gas Plant Water Offload Truck-In | Facility upgrade to allow for 100m3/d produced water |
Polar Star Canadian Oil and Gas Inc. | Laprise Creek, BC | 2017 | Pipeline Projects | 10″ – 12 km main trunk line /w several crossing considerations |
Pengrowth Energy Corp | Swan Hills, AB | 2014-2017 | Fugitive Emission Evaluation | Wellsite and facility fugitive emission calculations to re-classify process buildings as necessary to reduce equipment costs |
Pengrowth Energy Corp | Judy Creek, AB | 2016-2017 | Tank Replacements | Replacement and relocation of three tanks |
Painted Pony Energy Ltd. | Townsend, BC | 2016-2017 | Dual 12” Pipelines | Dual NPS 12” pipelines; 2,700m in length between existing risers |
Painted Pony Energy Ltd. | Fort St. John, BC | 2016 | Gas Plant Debottleneck & Expansion | Expansion from 28 MMSCFD to 40 MMSCFD |
Pengrowth Energy Corp. | Carson Creek, AB | 2015-2016 | Carson Creek Tank Installation | 15,000 bbl produced water storage tank, and 10″ flare |
Pengrowth Energy Corp. | Southern AB | 2015 | Custom Flow Splitter | Process sizing, selection, skid design, and integration of custom packaged pipeline flow splitter |
Pengrowth Energy Corp. | Southern AB | 2015 | Garrington Glycol Dehy Installation | Glycol Dehy into existing facility to allow for increased production |
Pengrowth Energy Corp | Southern AB | 2015 | Garrington Pipeline Installations | New pipeline to re-route field production |
Crew Energy Inc. | Fort St. John, BC | 2013-2015 | Septimus Gas Plant Expansion – Sour | Expansion from 20 MMSCFD sour gas inlet refrigeration and LPG extraction plant, and expansion to 40 MMSCFD |
Cabot Energy | Zama Lake, AB | 2014 | Field Development Projects | Field Development Projects such as greenfield single well batteries, pipeline installations and reactivations, oil effluence gathering systems |
Baytex Energy Corp. | Peace River, AB | 2014 | Water Disposal Facility | Expansion of existing oil battery to incorporate water handling. Installation of (3) 2000 bbl water tanks |
Madalena Energy Inc. | Paddle River, AB | 2011-2014 | Field Development Projects | Multiple oil batteries, well tie-ins, and various pipeline projects |
Pengrowth Energy Corp. | Central AB | 2013 | Lochend Battery Booster Compressor | Expansion to inscrease throughput from 18 MMSCFD to 23 MMSCFD of raw gas by upsizing dehydrator and installing booser compressor |
Pengrowth Energy Corp. | Southern AB | 2013 | Jenner SKUD | Addition of SKUD, booster pumps, & injection pump to increase water handling capacity at existing battery |
Pengrowth Energy Corp. | Judy Creek, AB | 2013 | Water Injection Facility & Pipeline | Water Injection Facility & Pipeline |
Pengrowth Energy Corp. | Swan Hills, AB | 2013 | Gas Pipeline Replacements | Multiple 4″ to 12″ LP & HP gas pipeline replacements |
Pengrowth Energy Corp. | Judy Creek, AB | 2013 | Booster Pump Installation | Water injection capacity of 16,000 m3/d at 14,900 kPag |
Crew Energy Inc. | Fort St. John, BC | 2010 | Septimus Gas Plant | Gas Plant Phase 1 – 22 MMSCFD |
Baytex Energy Corp. | Fort St. John, BC | 2012 | Cache 3-24 Satellite and Tie-In | 5 MMSCFD sour gas single well battery/w natural gas and fuel gas pipelines to/from existing 10-20 compressor station |
MOC WORK | ||||
Confidential Client | Various | 2018 – Ongoing | Pipeline Integrity | Repairs, Sectional Replacements, & Rerouting of pipelines between 8″ to 22″ |
Razor Energy Corp. | Central AB | 2018 | Facility & Pipeline Engineering Support | General Support, evaluation of MOCs, scoping small projects throughout Virginia Hills Oil Battery, Kaybob, & Swan Hills Operations |
Confidential Client | NE BC | 2017-2018 | Commissioning Support | Pine River, McMahon, Fort Nelson Gas Plant Turnaround Commissioning & Construction Support |
Pengrowth Energy Corp | Judy Creek, AB / Deer Mountain, AB | 2017 | Pipeline Replacements | Pipeline Replacements |
Confidential Client | Fort Nelson, BC | 2017 | Flare System Revamp | Flare System revamp at Fort Nelson Gas Plant. |
Confidential Client | Pounce, AB | 2015 | Progress Venturi VRU | Flare and VRU system revamp |
Confidential Client | Fox Creek, AB | 2014 | Fox Creek Brownfield Upgrades | Field driven time and cost sensitive projects |
Pengrowth Energy Corp. | Swan Hills, AB | 2013 | Gas Pipeline Replacements | Multiple 4″ to 12″ LP & HP gas pipeline replacements |
Pengrowth Energy Corp. | Swan Hills, AB | 2012 | TEG Contactor Equipment Upgrade | Replacement glycol contactor and new condensate coalescer and filter |
CLICK HERE TO DOWNLOAD our Domestic Project Highlights Brochure

INTERNATIONAL PROJECT HIGHLIGHTS
International Project Highlights
International Project Highlights
Acero has successfully completed over 50 conceptual, Pre-FEED, FEED, Detailed Engineering and Construction Support Projects in Iraq, Egypt, Chad, Sudan, India, Russia and South America. Our extensive experience with full scopes of project work, from concept through detailed engineering and construction management, allows Acero to examine the feasibility of various options and work with our clients to select a ‘best path forward’ for development.
MAJOR PROJECTS | ||||
Client | Location | Year | Project | Description |
Gran Tierra Energy Inc. | Colombia | 2019 | Gas Injection at AC-2 | Gas injection for 5 MMSCFD |
Gran Tierra Energy Inc. | Colombia | 2019 | Gas Injection at AC-4 | Gas injection for 5 MMSCFD |
Gran Tierra Energy Inc. | Colombia | 2018-19 | Standard Modular EPF | Modular EPF design (30k BOPD) |
PCM, a Glencore Company | Chad | 2018-19 | Mangara Well Tie-in Program | Multi wellpads c/w flowlines |
PCM, a Glencore Company | Chad | 2018-19 | Badila Well Tie-in Program | Multi wellpad c/w flowline |
Gran Tierra Energy Inc. | Colombia | 2017-19 | Putumayo Mobile Testing Facility | Extended well testing facility 3,000 BOPD |
Gran Tierra Energy Inc. | Colombia | 2017 | Acordionero CPF Expansion Phase 1 | CPF expansion from 3500 BOPD to 7500 BOPD |
Gran Tierra Energy Inc. | Colombia | 2017 | Acordionero CPF Expansion Phase 2 | CPF expansion from 7500 BOPD to 45000 BFPD |
Gran Tierra Energy Inc. | Colombia | 2017 | Acordionero Power Generation | Power generation 14 MW c/w Grid to feed CPF and 6 multiwell pads |
Gran Tierra Energy Inc. | Colombia | 2017 | Acordionero Water Injection | Water Injection Facility 30,000 BWPD |
Gran Tierra Energy Inc. | Colombia | 2017 | Acordionero CPF Truck Loading Facility | Truck loading Facility 30,000 BPD |
Gran Tierra Energy Inc. | Colombia | 2017-19 | Blending Facility and Crude Oil Export P/L | Blending Terminal and export P/L (20,000 BPD) |
Odin Petroil | Colombia | 2016 | Odin Petroil Distillation Facility | Upgrading of distillation facility 950 BPD to 1,800 BPD |
PCM, a Glencore Company | Chad | 2015 | Badila Power Generation | Power generation 9 MW c/w Grid to feed 31 wells, Water injection Facility and Camp |
Griffiths, a Glencore Company | Chad | 2015 | Crude Oil Topping Unit | Conceptual Study for a crude oil topping unit on the Kibea P/L |
PCM, a Glencore Company | Chad | 2015 | PCT Blending and Export Terminal Expansion | Expansion of the Blending and Export Terminal from 35k BPD to 75k BPD |
PCM, a Glencore Company | Chad | 2015 | Mangara Power Generation | Power generation 6 MW c/w Grid to feed 41 wells |
PCM, a Glencore Company | Chad | 2015 | Badila Satellite 2 | Satellite 7,000 BPD to handle 10 Wells |
PCM, a Glencore Company | Chad | 2014 | Badila Water Injection | Water Injection Facility 65,000 BWPD |
PCM, a Glencore Company | Chad | 2014 | Badila Gas Injection | Gas Injection Facility 12.4 MMSCFD |
Gran Tierra Energy Inc. | Peru | 2014 | Bretana Development – 20,000 BPD EPF | EPF 20,000 BOPD |
Confidential Client | Kurdistan | 2014 | Summail Gas Train 2 | 140 MMSCFD Gas plant c/w Amine and Dehy contactor |
Confidential Client | Kurdistan | 2014 | ENI Zubair O&MSF | OMSF 40,000 BOPD |
Confidential Client | Kurdistan | 2014 | EPF 10,000 BPD | EPF 10,000 BPD |
Confidential Client | Kurdistan | 2014 | EPF 10,000 BPD | EPF 10,000 BPD |
Confidential Client | Kurdistan | 2013 | Kuradmir Block Development | CPF 50,000 BOPD and 200 MMSCFD (c/w sulfur recovery plant) |
Confidential Client | Kurdistan | 2013 | Talisman K2 5,000 BOPD EWTF | EPF 5,000 BOPD (42 API and 4,000 GOR) |
Confidential Client | Kurdistan | 2013 | Talisman K3 5,000 Modified Testing Facility | EPF 5,000 BOPD |
Confidential Client | Kurdistan | 2013 | OS Standard EPF | Standard design for EPF 5,000 BOPD |
Confidential Client | Kurdistan | 2013 | Genel Miran EWT | EPF 5,000 BOPD (14 API & 75% WC) |
Confidential Client | Kurdistan | 2012 | HKN ST-1 5,000 BOPD EPF | EPF 5,000 BOPD (29 API) |
Canoro Resources Ltd. | India | 2011 | Amguri Inerim Condensate Recovery | 20 MMSCFD gas plant and 1,500 bpd condensate recovery |
Centurion Energy International Inc. | Egypt | 2011 | El Wastani Inlet Modifications | Gas Plant Optimization & De-Propanizer Addition |
Zedi Inc. | Russia | 2011 | Silver Jack Hydraulic Lift | Silver Jack Hydraulic Lift |
MOC WORK | ||||
PCM, a Glencore Company | Chad | 2019 | Camp Accomodation Upgrade – Mangara | Expansion of Mangara Camp |
PCM, a Glencore Company | Chad | 2019 | Camp Accomodation Upgrade – Badila | Expansion of Badila Camp |
PCM, a Glencore Company | Chad | 2019 | Adding of Pig Launchers and Receivers | Mangara – Badila Pipeline |
Gran Tierra Energy Inc. | Colombia | 2019 | Water Injection Pump Skid | TBD |
International Project Highlights Brochure CLICK HERE TO DOWNLOAD
Calgary
Headquarters
Suite 900, 600 6 Ave SW
Calgary, AB
Canada T2P 0S5
+1 403-237-7388
admin@aceroeng.com
Location
Find Us
Contact Us