LOCATION: Judy Creek, AB
Project featured the replacement of an existing 10,000 BBL shipping tank with a 3,000 BBL tank, replacement of a 3,000 BBL water tank with a 2,000 BBL tank, on-site jack-n-roll relocation and refurbishment of a 10,000 BBL produced water storage tank (including foundation design and roof replacement), and the complete construction planning and schedule control.