PROJECT: Tank Replacements COMPANY: Pengrowth Energy Corp. LOCATION: Judy Creek, AB
Project featured the replacement of an existing 10,000 BBL shipping tank with a 3,000 BBL tank, replacement of a 3,000 BBL water tank with a 2,000 BBL tank, on-site jack-n-roll relocation and refurbishment of a 10,000 BBL produced water storage tank (including foundation design and roof replacement), and the complete construction planning and schedule control.
PROJECT: Carson Creek Tank Installations COMPANY: Pengrowth Energy Corp. LOCATION: Carson Creek, AB
Project featured the detailed tank and foundation design and process review, procurement support of a 15,000 BBL produced water storage tank, and 10” flare installation to accommodate increased volume from tank.
INTERNATIONAL
PROJECT: Acordionero Blending Facility and Export P/L COMPANY: GranTierra Energy LOCATION: Colombia, South America
Acero was responsible for the FEED of a Blending Facility 20,000 BPD including 3D model, IFC earth work design, and RFQs for all long lead items as well as the pumping station, LACT and tie-in to an existing crude oil export pipeline.
PROJECT: PCT Blending & Export Terminal Expansion COMPANY: PCM, a Glencore Company LOCATION: Chad, Africa
Acero was responsible for increasing capacity of the PetroChad Transportation Company (PCT) blending and export terminal from a rate of 35,000 BPD to 75,000 BPD in Chad, Africa. Facility required installation of three 17,500 BBL storage tanks c/w heating capabilities and transfer/recycle pumps, electrical building, and chemical injection packages.