LOCATION: Chad, Africa
Acero was responsible for the conceptual study to evaluate the feasibility of installing a crude oil topping at the initial pumping station of a 16”, 520 km pipeline. Pipeline hydraulic simulations were also provided to analyze options for pump and heating stations, variations in MAOP, production capacities, and pipeline sizes, based on crude oil assay and temperature.